US $62 million power plant contract signed Print E-mail
ABB's will supply a System 800xA control installation, with boiler protection, and all instrumentation, to E.ON's 1100MW hard-coal-fired power plant.
Read more at: http://www.engineeringtalk.com/news/abf/abf144.html.
 
< Prev   Next >